Communicate with Supplier? Supplier
Cindy Liu Ms. Cindy Liu
What can I do for you?
Chat Now Contact Supplier

Jining Changsong Construction Machinery Co., Ltd.

Products

Home > Products > Bulldozer Spare Parts > Bulldozer Undercarriage Parts > SD22 SD23 Dozer Part number 154-30-00291 idler ass'y

SD22 SD23 Dozer Part number 154-30-00291 idler ass'y
SD22 SD23 Dozer Part number 154-30-00291 idler ass'y
SD22 SD23 Dozer Part number 154-30-00291 idler ass'y
SD22 SD23 Dozer Part number 154-30-00291 idler ass'y
SD22 SD23 Dozer Part number 154-30-00291 idler ass'y

SD22 SD23 Dozer Part number 154-30-00291 idler ass'y

Payment Type: L/C,T/T,Paypal,Money Gram,Western Union
Incoterm: FOB,CFR,CIF,FCA
Min. Order: 1 Piece/Pieces
Delivery Time: 2 Days

Basic Info

    Model No.: 154-30-00291

    Application: SD22/23 Bulldozer

    Origin: Jining,China

    Part Number: 154-30-00291

    Part Name: Idler

    Condition: Brand New

    Certificate: CE ISO

    Producing: Casting

Additional Info

    Packaging: Export packaging with PE film/Bubble bag/Carton/Wooden box/Pallet

    Productivity: 500pcs per month

    Brand: CS

    Transportation: Ocean,Land,Air

    Place of Origin: China

    Supply Ability: 500pcs per month

    Certificate: ISO9001&CE

    Port: Qingdao,Shenzhen,Guangzhou

Product Description

First, the precautions in use
1. The new machine should pass the running-in stage before use, and should not be put into use directly. In the [run-in" process, special attention should be paid to lubrication and maintenance, as well as instrument inspection work, and faults are eliminated in time.
2. When the ambient temperature is lower than 5 °C, the cooling water should be heated to 80 °C and then added to the water tank until the water discharge door is closed and then closed, and then continue to fill.
3. After the diesel Engine is started, it must be preloaded without load, the oil temperature is not up to the working range, and it is not necessary to start driving.
4. During the start:
Do not pull directly from the neutral position to the second or third gear position to avoid the Bulldozer starting speed is too large, causing the transmission components to withstand excessive impact loads.
Do not pull the throttle lever to the maximum throttle position before gearing.
The position of each lever must be accurate, thorough, and not to be stopped, so as to prevent the clutch friction plate from slipping, resulting in serious burns and wear.


SD22 SD23 Dozer Part number 154-30-00291 idler ass'y

shantui front idler




We have Rich experiences Maintenance and repair Technical Engineers team,which means can provide Customs with high efficiency Maintenance Services on site and off site.In the past few years ,we have running the Maintenance services very well all over the world,solved the problems in time,because of our outstanding technical services for Bulldozer,Pipelayer,Excavator,Wheel loader!

We can also supply the goods for the Wheel Excavator , Crawler Excavator ,Construction Machinery Attachment ,Bulldozer spare part ,Excavator Spare Parts , Power Generator Set




Jining ChangSong Construction Machinery Co.,Ltd is founded in 2000,located in jining city,Shandong province.Which is the homwtown of Confucious and Mencious. From the year of 2009.We successfully won the supplier qualification of China Petroleum Pipeline Bureau(CPP),Sinohydro Corporation Ltd,China Railway Group Ltd.(CTCE).Shantui Imp&Exp Co.,Ltd ,China Datang Corporation etc Super Large multinational enterprises.
We have rich experiences Maintenance Technical Engineer team,which means can provide Customs with highly efficiency Maintenance and Repair Services.Be Faithful to Our Original Aspiration and Continue Marching Forward,to achieve the Cooperation win-win target.


Looking for ideal TY220 Front Idler Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the TY230 TY230F Idler are quality guaranteed. We are China Origin Factory of Bulldozer Parts Idler. If you have any question, please feel free to contact us.

Product Categories : Bulldozer Spare Parts > Bulldozer Undercarriage Parts

Send Inquiry

Cindy Liu

Ms. Cindy Liu

Email:

henryliu@chsmachinery.com

Send Inquiry

Tel:86-0537-3209399

Fax:86-0537-3209399

Mobile Phone:+8617753399527Contact me with Whatsapp

Email:henryliu@chsmachinery.com

Address:Electrical and mechanical way, rencheng distict, Jining city, Shandong province, Jining, Shandong